+ PROJECT  GREGORY HILLS CORPORATE PARK
+ BUSINESS UNIT(S)  INFRASTRUCTURE & INDUSTRIAL

+ CLIENT  GREGORY HILLS CORPORATE PARK PTY LIMITED
+ OFFICE  NORWEST

The Gregory Hills Corporate Park project involved the construction of 5 industrial Lots, a private link road, slip lane into the new SOMA Wellness centre and the completion of final landscaping and footpath works for the site.

A condition of the development works involved the construction of the final section of Hermitage Way linking Gledswood Hills to Gregory Hills. This section of road was a much anticipated and long-awaited final piece of the puzzle for many residents of both suburbs.

Orion Consulting was engaged by Gregory Hills Corporate Park to finalise the Bulk Earthworks and manage the internal and external Civil Works.

Edmund Tsang

Tight delivery time frames were required to complete the works. Camden Council are the certifying authority and negotiation was required to ensure the extension of Hermitage Way was completed and handed over in a timely duration. Utility approvals were also not at an approved stage and were delaying construction works. A large stockpile of drainage material was imported for stormwater drainage but was not approved by Council. Surplus import material was also required to be managed onsite to comply with design finished levels.

Camden Council were the certifying authority and Orion Consulting assisted by providing Project Management and Superintendency Services to ensure all quality assurance processes were adhered to throughout the development to the satisfaction of Council Engineers.

Stockpiled drainage material was utilised for a portion of drainage works onsite after negotiation with Council and the remainder negotiated and approved for use as a bedding material for the footpath works surrounding the estate.

Earthworks model was redesigned to ensure the maximum design tolerance was utilised, whilst still ensuring adequate crossfall maintained and complied with future vendor contracts.

Through all problem solving and meticulous negotiation with Council, all stages were able to be completed to the Council and Clients satisfaction. Local residents were also pleased to have the link between Gledswood Hills and Gregory Hills Completed.

Construction Management and Principal’s Representative